PRODUCT CATEGORY · DATA-CENTRE INFRASTRUCTURE

Racks, power, cooling and structured cabling

The supporting infrastructure behind every production build. Sourced on request, delivered DDP.

Data-centre infrastructure — racks, PDUs, UPS systems, precision cooling, structured cabling — usually ships alongside the compute and storage tier rather than as a standalone procurement. MegaCore sources it on request through specialist vendors (Vertiv, Eaton, APC by Schneider, Stulz, Panduit and equivalents) and delivers it DDP alongside the rest of the build, so the integrator gets one supplier coordinating the full rack-out rather than three.

WHAT WE COVER
RACKS

Server racks and cabinets

Server racks, network cabinets, open-frame racks and containment hardware in 24U / 42U / 48U formats — Vertiv, APC, Eaton, and equivalent specialty vendors on request.

01 / 04
POWER

PDUs and UPS

Intelligent PDUs (metered, switched, hot-swap) and UPS systems — line-interactive and double-conversion topologies from Eaton, Vertiv, APC by Schneider and equivalents.

02 / 04
COOLING

Precision and row-based cooling

CRAC / CRAH precision cooling, row-based in-row units and rear-door heat exchangers from Vertiv, Stulz and specialty manufacturers on request.

03 / 04
CABLING

Structured cabling and KVM

Copper and fibre structured cabling, patch panels, KVM switches and out-of-band management appliances — Panduit, Vertiv, Raritan and equivalents.

04 / 04
ABOUT THIS CATEGORY

Supporting infrastructure sourced on request

Data-centre infrastructure typically arrives alongside the compute and storage tier rather than as a standalone procurement. MegaCore sources racks, power, cooling and cabling on request through specialist vendors and ships everything DDP as one consolidated build so the integrator works with one supplier rather than three.

Brands here vary more than in compute or networking — the right rack, PDU or precision cooling unit usually depends on the existing data-centre footprint. We confirm vendor, model, lead time and delivery logistics in the quote stage so the entire rack-out lines up on a single timeline.

WHAT WE SUPPLY

Four sub-categories, one supply path

Where each piece fits in a Balkan integrator data-centre build.

Racks and cabinets

Server racks, network cabinets, open-frame racks and aisle containment — 24U / 42U / 48U formats with appropriate weight ratings.

  • · Vertiv VR / APC NetShelter / Eaton
  • · Open-frame and seismic-rated variants
  • · Hot / cold aisle containment hardware
Lead time: 4–8 weeks DDP

Power — PDU and UPS

Intelligent PDUs and UPS systems for rack and row-level power distribution and protection.

  • · Vertiv Geist / APC AP / Eaton ePDU
  • · Line-interactive UPS for small DC / closet
  • · Double-conversion UPS for production tier
Lead time: 6–10 weeks DDP

Cooling, cabling and management

Precision cooling, structured cabling, KVM and out-of-band management — sourced through specialist vendors on request.

  • · Vertiv / Stulz precision cooling
  • · Panduit / structured cabling
  • · Raritan / Vertiv KVM and OOB
Lead time: 6–14 weeks DDP
WHY MEGACORE FOR DATA-CENTRE INFRASTRUCTURE

Sourced alongside the build, one consolidated supply path

Vendors
Vertiv, APC by Schneider, Eaton, Stulz, Panduit, Raritan — and equivalents on request
Coordination
Racks, power, cooling and cabling shipped with the compute / storage build
Terms
DDP · EUR or RSD · 30% prepayment standard
Channel respect
We supply you; we do not contact your end-client, propose alternative configurations, or follow up post-sale. The relationship runs through you.

MegaCore is an independent supplier. Vertiv, APC, Eaton, Stulz, Panduit, Raritan and related marks are trademarks of their respective owners, used here for nominative descriptive purposes only. Brand and model availability vary by lead time and region — we confirm the applicable details per shipment before contract.

CONTACT

Tell us what you need

Send the rack layout, the power profile and the delivery country. We respond within 48 hours with availability path, indicative lead time and partner pricing across the appropriate vendor. For full white-space build-outs expect a coordinating call rather than an instant quote — racks, power, cooling and cabling have different lead times and we align them so the build hits one timeline.